Fill dirt for grading, holes and raising grade
Dirt Calculator
Fill dirt in cubic yards = area × depth ÷ 27 (feet). Compaction matters more here than with mulch: many jobs add 10% or more so the finished grade does not sink. Enter length, width and depth to get yards, tons and cost.
Cubic yards to order
3.26 yd³
- Exact volume, before extra
- 2.963 yd³
- Estimated weightTypical density; moisture changes it.
- 4.24 US tons
- Cubic feet
- 88.00 ft³
- Cubic meters
- 2.492 m³
- Estimated cost
Worked examples
Filling a low spot in the yard
An area 15 ft × 8 ft that is 6 inches low, with 15% extra for compaction.
2.56 yd³ · ≈ 3.32 US tons
Backfilling around a foundation
A trench 40 ft long, 2 ft wide and 3 ft deep, with 10% extra.
9.78 yd³ · ≈ 12.71 US tons
Dirt for a round fire pit mound
A circle 8 ft across and 1 ft high, no extra.
1.86 yd³ · ≈ 2.42 US tons
Good for
- Backfilling after digging out roots, pools or old pads
- Raising a low spot before you place topsoil or sod on top
- Estimating how many yards a landscaper should deliver for rough grade
- Comparing fill dirt vs sand when drainage is the real goal
Common mistakes
- Using fill dirt as the only growing medium in a vegetable bed
- Forgetting compaction — tamped fill needs more volume than loose piles suggest
- Ordering topsoil prices for a job that only needs cheap fill below grade
- Measuring the hole at the top only when sides slope inward
How to calculate how much dirt you need
- Find the volume of the space. For a rectangle, multiply length × width × depth in feet. For a round hole, use π × (diameter ÷ 2)² × depth.
- Convert depth to feet first (inches ÷ 12). Mixing inches and feet is the most common mistake.
- Divide cubic feet by 27 to get cubic yards.
- Add an allowance for compaction. Loose fill settles when tamped or rained on, so you need more than the hole’s measured volume.
- To estimate tons, multiply by the dirt’s weight per cubic yard (fill dirt is typically around 1.2–1.5 tons).
Cubic yards for common raised bed sizes
Exact volume with no extra allowance.
| Bed size | Fill depth | Cubic yards |
|---|---|---|
| 4 ft × 4 ft | 6 in | 0.30 |
| 4 ft × 4 ft | 12 in | 0.59 |
| 4 ft × 8 ft | 6 in | 0.59 |
| 4 ft × 8 ft | 12 in | 1.19 |
| 4 ft × 12 ft | 6 in | 0.89 |
| 4 ft × 12 ft | 12 in | 1.78 |
| 3 ft × 6 ft | 6 in | 0.33 |
| 3 ft × 6 ft | 12 in | 0.67 |
Approximate weight per cubic yard
Typical values used by this calculator. Wet dirt weighs more.
| Material | US tons per cubic yard (typical range) | Value used here |
|---|---|---|
| Topsoil | 1.1 – 1.4 | 1.25 |
| Fill dirt | 1.2 – 1.5 | 1.3 |
| Sand | 1.2 – 1.5 | 1.35 |
Frequently asked questions
How many cubic yards of dirt do I need to fill a hole?
Measure length, width and depth in feet, multiply them, and divide by 27. Then add 10% or so for compaction. For a hole 5 ft × 4 ft × 3 ft that is 60 ÷ 27 = 2.2 cubic yards, or about 2.4 with 10% extra.
How much does a cubic yard of dirt weigh?
Often around 1.2 to 1.5 US tons, depending on moisture and how much clay, sand or rock is in it. This calculator uses a middle value for each type.
What is the difference between fill dirt and topsoil?
Fill dirt is subsoil used to raise or level ground and give a stable base. Topsoil is richer in organic matter and is meant for growing plants. Use fill for depth and finish with topsoil if you will plant.
How much dirt fits in a pickup truck?
It depends on the truck bed and the weight limit. Weight, not volume, is usually the limit for dirt, so check your truck’s payload rating against the tons shown above before loading.
Do I need extra dirt for compaction?
Usually yes. Loose fill packs down when it is tamped, watered or driven over. Contractors often add around 10% or more depending on the soil and how firmly it will be compacted. Ask your supplier or contractor for a figure that fits your job.
Sources and updates
Last reviewed .
- NIST – Unit conversion factors – Length definitions used for unit conversion.
- Fill dirt density and compaction allowance – Typical supplier ranges. Replace with named sources before launch.
Estimates for planning. Compaction and weight vary by soil, so confirm with your supplier or contractor.